Construction progress capture

What was in place on the thirtieth, evidenced rather than argued.

Request a quote

A civil construction site photographed from above for progress capture

What it is

A progress claim is a statement about a date. Photographs from the ground argue about it; a georeferenced orthomosaic captured on the day settles it. Because every capture uses the same control network and the same flight plan, this month sits exactly on top of last month.

Specification

The numbers, published

Horizontal accuracy
±25 mm (1σ, checkpoint residual)
Vertical accuracy
±40 mm (1σ, checkpoint residual)
Ground sample distance
10 mm/px at 60 m AGL
Repeat registration
Same control network each capture
Deliverables
GeoTIFF / ECW orthomosaic, DSM, comparison set, control report
Datum / projection
GDA2020 / MGA Zone 50
Turnaround
48 hours from flight

Accuracies are 1σ residuals measured at independent checkpoints excluded from the adjustment. Every figure on this page is invented for a demonstration build.

Method

How we do it

  • The same control every time

    Control targets are surveyed once and re-occupied on each capture. Two orthomosaics that share a control network can be compared pixel to pixel; two that do not are two separate pictures.

  • A fixed interval, booked ahead

    Monthly, fortnightly or at agreed milestones. Booked in advance, because the value is in the series and a missed month cannot be recovered later.

  • Comparison, not just capture

    Each delivery includes the current capture and a comparison against the previous one, so the change is the deliverable rather than something you have to find.

Request a quote

Tell us the job and a real number comes back

Where, how big, how accurate, what format, by when. Five things you already know, and we can price it without a discovery call.