DATUMAERIAL

02 / Capability

Topographic and as-built survey

Built where the design says, or not. The survey settles it.

Request a quote

Contours generated from an aerial survey overlaid on the terrain

What it is

A conformance check asks one question: is the built surface within tolerance of the design surface? Answering it needs a measured surface dense enough that the answer is not an interpolation between rover shots twenty metres apart. Aerial capture gives a point every twelve millimetres, and breaklines drawn where the landform actually breaks.

Specification

The numbers, published

Horizontal accuracy
±25 mm (1σ, checkpoint residual)
Vertical accuracy
±40 mm (1σ, checkpoint residual)
Ground sample distance
12 mm/px at 70 m AGL
Contour interval
0.1 m to 1.0 m, your choice
Deliverables
DXF, 12da, GeoTIFF DTM and DSM, LAS 1.4, control report
Datum / projection
GDA2020 / MGA Zone 50, AHD heights
Turnaround
48 hours from flight

Accuracies are 1σ residuals measured at independent checkpoints excluded from the adjustment. Every figure on this page is invented for a demonstration build.

Method

How we do it

  • Breaklines are drawn, not derived

    Crests, toes, kerb lines and drainage inverts are picked as breaklines rather than left to a contouring algorithm. A contour set generated straight off a point cloud looks fine and rounds off every edge that matters.

  • Your format, your datum, before we deliver

    DXF or 12da, layer naming to your standard, GDA2020 / MGA Zone 50 with AHD heights unless you specify otherwise. Agreed at quote, not discovered at delivery.

  • Checked against the design

    Where a design surface is supplied, we return a cut/fill comparison against it — so the conformance answer arrives with the survey rather than a week later.

Request a quote

Tell us the job and a real number comes back

Where, how big, how accurate, what format, by when. Five things you already know, and we can price it without a discovery call.