DATUMAERIAL

01 / Industry

Mining and resources

Month-end reconciliation, pit progression and stockpile tonnage — without putting a crew in the pit.

Request a quote

An open-cut mining operation photographed from the air at dawn

The problems

What we get called about

  • 01

    Month-end lands whether the survey does or not

    Reconciliation has a date. A ground crew that cannot get on the ROM pad until the fourth has already made the number late, and a late number gets estimated. An aerial capture takes an hour and delivers in forty-eight.

  • 02

    Somebody has to walk the pile

    Ground survey of stockpiles and active benches means a person on foot near moving material and working plant. That exposure is getting harder to justify at every site we work on, and it is the first thing a ground-disturbance permit asks about.

  • 03

    The volume gets challenged

    A reconciliation variance triggers a question about the survey. If the answer is "the operator said survey-grade", the survey loses. If the answer is a control report with residuals at six independent checkpoints, it does not.

  • 04

    Pit progression needs the same surface every time

    Comparing this month to last month only works if both were captured against the same control. Two independently-controlled surveys of the same pit will disagree, and the disagreement will be blamed on the pit.

Accreditation and access

Getting on site

We operate under a CASA Remote Operator Certificate with public liability cover, and our crews carry standard WA resources site inductions. A job safety analysis is issued before mobilisation and airspace is checked against the site’s own aviation requirements — most operating sites have them, and a drone operator who does not ask is a problem.

Request a quote

Tell us the job and a real number comes back

Where, how big, how accurate, what format, by when. Five things you already know, and we can price it without a discovery call.